Showing posts with label road resurfacing. Show all posts
Showing posts with label road resurfacing. Show all posts

Monday, September 4, 2017

Road work to start Tuesday on Rte. 34 in Derby, Seymour

Sharing a release from state Sen. George S. Logan, R-Ansonia:

The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 34 (Roosevelt Drive) in Seymour and Derby, beginning Tuesday, Sept. 5.

The project consists of milling and resurfacing a 4.34-mile segment of Route 34 (Roosevelt Drive) in Seymour and Derby.

This project is scheduled to occur from 8 p.m. to 5 a.m. Tuesday, Sept. 5, to the morning of Tuesday, Sept. 26.

Motorists can expect lane closures on Route 34 (Roosevelt Drive) between Route 188 (Squantuck Road) and Bridge Street.

The regular work schedule for this project is 8 p.m. to 5 a.m. (Sunday through Thursday).



Friday, April 28, 2017

Gentile, Logan urge caution during Rt.115 resurfacing project

The Connecticut Department of Transportation has announced a nighttime milling and resurfacing project will be performed on Rt. 115 (Derby Avenue) in Derby and Ansonia, from this Sunday to the morning of May 9. 


State Rep. Linda M. Gentile, D-Ansonia, and state Sen. George S. Logan, R-Ansonia, would like to caution drivers during this construction period. 

“I am asking all motorists and commuters to be patient and to use caution while the DOT undergoes this project,” Gentile said. 
“Safety is of the upmost importance and I hope that residents will take precautions during this time.”

"Many residents may not be aware that this road work will be taking place," Logan said. "We are helping ConnDOT spread the word so that area motorists can plan accordingly."

The project consists of milling and resurfacing a .85 mile segment of Rt. 115 in Derby and Ansonia. Work hours will be from 8 p.m. to 5 a.m. 

Motorists should expect lane closures on Rt. 115 between Rt. 34 and Division Street.  
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 8 p.m. to 5 a.m. (Sunday-Friday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  
Motorists are advised to maintain a safe speed when driving in this vicinity. 


This is a press release from the House Democrats' office.

         

Wednesday, November 16, 2016

DOT to resurface Rte. 8 in Seymour, lane closures planned

The Connecticut Department of Transportation has announced that a nighttime milling and resurfacing project will be performed on Route 8 Northbound in Seymour beginning Thursday.
The project consists of milling and resurfacing a 0.135-mile segment of Route 8, NB in Seymour. 

The project is scheduled to occur from 8 p.m.-5:30 a.m. Thursday, through Saturday morning.

LANE CLOSURE INFO
Motorists can expect lane closures on Route 8, NB between the Exit 19 (Wakelee Avenue) on ramp and Exit 21 (Derby Avenue) off ramp. 

Impact attenuators, state police, and signing patterns will be utilized to guide motorists through the work zone. 
The regular work schedule for this project is 8 p.m.-5:30 a.m. (Thursday through Saturday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. 
Motorists are advised to maintain a safe speed when driving in this vicinity.


This is a press release from the website of state Sen. Rob Kane.

Wednesday, September 21, 2016

DOT ready to resurface Route 115 in Ansonia

State Rep. Linda M. Gentile, D-Ansonia/Derby, is asking that motorists drive safely during an upcoming construction project.

A more than two-mile section of Route 115/Main Street in Derby and Ansonia is getting a facelift. 

The Department of Transportation will resurface the road between State Street and Division Street beginning Sept. 25.  
Crews will work between the hours of 8 p.m. and 5 a.m. with the project expected to be completed Oct. 7. 
Weather conditions could alter this construction plan.

Most important, for everyone’s safety, motorists should use caution when driving through the work zone. There will be lane closures, sign patterns and traffic control while the work is being done.


You can view the Connecticut DOT Press Release here: http://bit.ly/2d4MaMt.


This is a press release from Gentile's office.